(Fill: 7906) Beam mode changed to: INJECTION PHYSICS BEAM

(Fill: 7906) Beam mode changed to: INJECTION PROBE BEAM

(Fill: 7905) Beam mode changed to: INJECTION PHYSICS BEAM

(Fill: 7905) Beam mode changed to: INJECTION PROBE BEAM

(Fill: 7903) Beam mode changed to: INJECTION PHYSICS BEAM

(Fill: 7903) Beam mode changed to: INJECTION PROBE BEAM

Comments (19:41:17) scrubbing with 2x72b trains at 450 GeV

Comments (19:28:02) scrubbing with 2x72b at 450 GeV

Comments (19:18:09) scrubbing with 2x72b at 450 GeV
no beam from PS, cavity tripped

(Fill: 7902) Beam mode changed to: INJECTION PHYSICS BEAM

Comments (19:09:08) scrubbing with 2x72b at 450 GeV

Comments (17:01:16) next: scrubbing with 2x72b at 450 GeV
awaiting beam from injectors
dipole in PS-SPS TL tripped

(Fill: 7902) Beam mode changed to: INJECTION PROBE BEAM
Active filling scheme changed to: 25ns_2472b_v2_19inj_2x72bpi_scrub2022

Comments (16:52:01) next: scrubbing with 2x72b at 450 GeV

(Fill: 7902) Beam mode changed to: SETUP
Active filling scheme changed to: 25ns_2472b_19inj_2x72bpi_scrub2022

Comments (16:29:01) ramp down
next: scrubbing with 2x72b at 450 GeV

Beam Post Mortem:
PM event ID: Sat Jul 02 15:42:16 CEST 2022
PM event category: PROTECTION_DUMP
PM event classification: MULTIPLE_SYSTEM_DUMP
PM comment: FMCM test on RD34.LR3

(Fill: 7901) Beam mode changed back to: RAMP DOWN

Comments (15:26:46) squeezing to 30cm for end of fill tests
then: dump, ramp down & scrubbing

Show older
botsin.space

A Mastodon instance for bots and bot allies.